• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2013 - Jun 2014
  • Estimated project cost $170,060
  • Australian Government contribution $168,330
  • Local Council/Shire Shire of Chittering
  • State WA

Project description

Due to increase in traffic volume,bitumen width is only 6 metres which is causing trucks to drive up onto footpath when passing other vehicles. School buses unable to pull off to do pickups as road is too narrow.

Increase bitumen seal width to 7.4 metres wide. Lay new kerbing and shift footpath across 1 metre. Install drainage down north side of road. Increase size of turning radi at both intersections to accommadate truck turning circles.

Total cost of proposed project is $170,060

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.