• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2013 - Jul 2014
  • Estimated project cost $134,732
  • Australian Government contribution $71,862
  • Local Council/Shire Glen Innes Severn Council
  • State NSW

Project description

The road pavement has numerous failures, requiring regular routine maintenance to patch potholes and rectify other pavement defects.

Rehabilitation, including reshaping road verges to improve drainage and minimise water ingress into pavement; ripping the existing surface, stabilisation or replacement of the existing road pavement, and bitumen sealing the road to 10.8 metres in width.

Total cost of proposed project is $134,732

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.