• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2013 - May 2014
  • Estimated project cost $387,587
  • Australian Government contribution $387,587
  • State SA

Project description

The floodways to be upgraded are currently lying below the natural surface level, the existing road has poor drainage and after moderate rainfall the road is inundated with water which weakens the pavement, resulting in road closures.

The work will consist of excavating existing material and replace with crushed rock,to improve the vertical alignment,increase strength and improve drainage.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.