• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2013 - Jun 2014
  • Estimated project cost $123,070
  • Australian Government contribution $108,000
  • Local Council/Shire Cocos (Keeling) Islands Shire Council
  • State WA

Project description

Current road is an undulating grassed sand road with no design and prone to flooding during rain events. The road creates dust during the dryer months.

Design a brick paved road 136 metres long to tie in with existing Vacuum Sewer pits and allow for torrential rains to flow under or over the road to the drainage system. Construct kerbing each side and produce 22,440 bricks to pave the road.

Total cost of proposed project is $123,070

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.