• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2014 - Apr 2014
  • Estimated project cost $109,000
  • Australian Government contribution $109,000
  • Local Council/Shire City of Mount Gambier
  • State SA

Project description

Commercial Street East is one of the heaviest trafficked roads in the city and the extraordinary wet months of winter have accelerated the rate of deteriation of the road pavement (evidenced by the pavement material being "pumped" up through the surface cracks) and it is timely to address this problem as a matter of irgency.

The proposal is to remove the cracked areas of road pavement to a predetermined design depth and replace with assphalt. Commercial Street East carries very high traffic volumes (it is the highest trafficked road in the City) and it imperative that the works are carried out quickly and with minimum delays. The new aspalt will strenghten the road pavement and also provide a long lasting and smooth surface for traffic.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.