• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2014 - May 2014
  • Estimated project cost $89,178
  • Australian Government contribution $19,485
  • Local Council/Shire Parramatta City Council
  • State NSW

Project description

The road section has been affected by cracking and loss of shape along kerb and gutters. The existing surface is old and brittle. Some potholes have been developed. The road has been patched in the past to rectify pavement failures.

The proposed treatment includes repair of pavement failures by patching with asphalt and resurfacing of the road section with asphalt. Length = 308 m; Width = 10.2 m; Area = 3142 m2

Total cost of proposed project is $89,178

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.