• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2013 - May 2014
  • Estimated project cost $171,962
  • Australian Government contribution $16,816
  • Local Council/Shire Shire of West Arthur
  • State WA

Project description

Poorly drained, salt affected and shoved, 6.2 metres wide aging bitumen sealed road.

Construct deep drainage and outfall, install subsoil drainage to spring where required, lift an average 150mm and widen existing gravel base to 9 metre, cement stabilise to 150mm deep. seal to 7 metre wide with C170 bitumen and 14mm stone.

Total cost of proposed project is $171,962

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.