• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2014 - Nov 2014
  • Estimated project cost $275,000
  • Australian Government contribution $248,721
  • Local Council/Shire Shire of Dowerin
  • State WA

Project description

4 metre bitumen seal is breaking up and very potholed in numerous sections. The road is not wide enough for heavy vehicle traffic

Widen running surface to 10m with a reconstructed 7.2m two coat bitumen seal. In October 2014 we will be carrying out the pruning works of vegetation to enable us to widen that section of road as it is very over grown. Then we will be commencing the gravel laying, wetmixing including cement stabilisation and sealing hopefully finishing by the end of November 2014.

Total cost of proposed project is $275,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.