• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2015 - Feb 2016
  • Estimated project cost $691,583
  • Australian Government contribution $691,583
  • Local Council/Shire Coffs Harbour City Council
  • State NSW

Project description

The pavement has deteriorated and is potholed and deformed. It is past its useful life. A rough ride is evident and poses a risk to motorists

Total Pavement reconstruction by box out and replacement, with some kerb and gutter construction with hot bitumen seal (1920m2). Geotechnical investigation revealed that existing pavement was not suitable for stabilisation. Subsoil drains required in some areas

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.