• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2014 - Mar 2015
  • Estimated project cost $242,000
  • Australian Government contribution $42,000
  • Local Council/Shire Shire of Waroona
  • State WA

Project description

The subject section of Somers Road has reached the end of its serviceable life and is severely cracked and failing under modern traffic loads. Additionally, the existing seal width of approximately 5.4 metres is inadequate for the traffic it carries. Longitudinal drainage is also inadequate in a low lying wet area.

Widening and lifting of the road structure to lift it out of the wet subgrade. Improvements to longitudinal drainage. Importation of new pavement material and application of a hot bitumen seal to a minimum width of 6.4 metres.

Total cost of proposed project is $242,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.