• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2016 - Apr 2017
  • Estimated project cost $420,987
  • Australian Government contribution $325,315
  • Local Council/Shire Shire of Northampton
  • State WA

Project description

Road seal is only 3.5 metres in width at these sections and is unsafe for passing of trucks and vehicles, road is a 27.5 metre road train route

Reconstruct each section to a bitumen sealed width of 7 metres, apply one coat of bitumen using 14mm aggregate, and construct gravel shoulders on each side of bitumen to 1.2 metres wide aggregate. A second coat seal to be applied in 2017/2018

Total cost of proposed project is $420,987

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.