• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2014 - Dec 2014
  • Estimated project cost $97,465
  • Australian Government contribution $97,465
  • Local Council/Shire Shire of Cuballing
  • State WA

Project description

Poor road standard causes continuous maintenance requirement and road safety issues. The gravel road is continually impacted by the high traffic levels, particularly large trucks, creating corrugations and blow outs, that require additional ongoing maintenance and create a road safety hazard. Improving road standard will reduce ongoing road maintenance requirement, improve access to a wider range of road users and improve road safety by being a safer road.

Remove encroaching vegetation. Improve roadside drainage. Import, lay and compact road base onto the road surface. Seal the road surface with bitumen. Install signage and guide posts.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.