• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2014 - Dec 2014
  • Estimated project cost $11,442
  • Australian Government contribution $11,442
  • Local Council/Shire Narrandera Shire Council
  • State NSW

Project description

Undulated kerb, deteriorated nature strip and driveway not meeting the required slope. A lot of elderly population comes to Barellan Club and there was safety issue.

Realign the kerb for proper drainage, remove 30-40 mm of existing surface in nature strip and replace with asphalt

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.