• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2015 - Jun 2015
  • Estimated project cost $813,676
  • Australian Government contribution $473,139
  • Local Council/Shire Brimbank City Council
  • State VIC

Project description

The existing road pavement exhibits areas of severe roughness and loss of shape. In addition significant lengths of concrete kerbing is in a poor condition.

It is proposed to rehabilitate 577 metres of existing road pavement and resurface with asphalt, reconstruct 870 metres of existing kerb and channel, reconstruct existing vehicle crossings where required and construct 88 metres of underground drainage.

Total cost of proposed project is $813,676

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.