• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2015 - Jun 2015
  • Estimated project cost $214,724
  • Australian Government contribution $207,298
  • Local Council/Shire Paroo Shire Council
  • State QLD

Project description

The road consists of black soil formed sections and red loam formed sections. The purpose of the works is to address the deteriorated state of the road. It has lost its cross fall and table drain shape. It is very rough to drive on and requires a reduction in speed for safety purposes. The black soil sections become non trafficable in wet wether.

The scope of works includes heavy formation grading of the red loam sections; sheeting of some black soil and red load sections.

Total cost of proposed project is $214,724

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.