• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2014 - Jun 2015
  • Estimated project cost $448,273
  • Australian Government contribution $50,000
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

For road classification and road use, the existing seal and pavement width are inadequate; vehicles travelling in opposite directions can not pass safely. Cross fall is inconsistent/non existent. Pavement is uneven and is old and degrading. Bitumen edges are being worn away. Existing culverts and road side drains do not adequately remove water away from the road pavement.

Reconstruct and widen Perup Road to Shire Standard: 150mm thick gravel, 8 metre pavement and 6 metre seal. Replace two culvert crossings with larger diameter pipes. Place precast headwalls to culverts. Reform table and cut off drains to ensure water runs away from road pavement. Place warning signs and guideposts to the appropriate Standard.

Total cost of proposed project is $448,273

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.