• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2015 - May 2015
  • Estimated project cost $15,592
  • Australian Government contribution $12,592
  • Local Council/Shire Bogan Shire Council
  • State NSW

Project description

The existing stock grid which is also used as a drainage structure for the flow of storm water is colapsing dour to inadequate concrete footings. Vehicles can not use the grid in it's present condition and drainage is impeded.

Install a new heavy vehicle stock grid to improve drainage and prevent stock from accessing the Barrier Highway.

Total cost of proposed project is $15,592

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.