• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2014 - Dec 2014
  • Estimated project cost $323,097
  • Australian Government contribution $323,097
  • Local Council/Shire Temora Shire Council
  • State NSW

Project description

Stage two of Howards Road Reconstruction Project. Insufficient pavement seal width of 5m-5.3m. Major Sections of pavement deformation and failure. Extensive cracking past repair by way of maintenance.

Rip and reshape existing pavement to 130mm below FSL, add 150mm loose volume of ridge gravel, insitu mix 250mm below design FSL incorporating 1.5% quicklime by weigh. Compact trim and seal with a two coat 14mm/7mm double / double C170 grade bitumen seal.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.