• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jun 2015 - Mar 2016
  • Estimated project cost $35,104
  • Australian Government contribution $35,104
  • State SA

Project description

The existing sealed road is preventing water from draining to lower areas, flooded a house on Swan TCE

The work will involve the reconstruction of an 80 metres section of road which will include the reconstruction of the vertical alignment and sealing to 7 metres, to provide an impermeable surface and allow water to drain.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.