• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2015 - May 2015
  • Estimated project cost $74,369
  • Australian Government contribution $74,369
  • Local Council/Shire City of Belmont
  • State WA

Project description

Age, cracking and deterioration of asphalt wearing course allowing water to penetrate into the base course materials below. Drainage upgrades to existing structures.

Length, width and area of job: 293m x 6.6m = 1,933m2. Full length of the road to have the existing asphalt surface milled away from the kerbing by up to 1m and then a new asphalt wearing course applied as an overlay. Upgrade existing drainage structures to match the new asphalt finished level.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.