• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2016 - May 2016
  • Estimated project cost $189,515
  • Australian Government contribution $170,000
  • Local Council/Shire City of Burnside
  • State SA

Project description

The precast concrete kerbs segments are deteriorating, spalling at the joints and have sunk considerably, reducing the kerb height to as little as 1cm in some places. Due to the flat ground there is some ponding as well

It is proposed to remove and replace the segmented kerbing with cast in place kerb and gutter, and to replace the side entry pits to better collect the stormwater.

Total cost of proposed project is $189,515

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.