• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2016 - May 2016
  • Estimated project cost $394,285
  • Australian Government contribution $394,285
  • Local Council/Shire City of Mitcham
  • State SA

Project description

East Parkway is a relatively high trafficked road and bus route. The road pavement and seal are showing signs of distress with significant failed areas. Testing of the existing road pavement indicates that the road pavement is deficient of road base materials by 270mm. East Parkway is 755 meters in length and is classified as a “Distributor” road with a vehicle traffic volume of 4,575 vehicles per day.

It is proposed to replace the road seal and pavement with a 130mm Asphalt pavement followed with 40mm Asphalt seal.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.