• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2015 - Feb 2016
  • Estimated project cost $140,950
  • Australian Government contribution $138,440
  • Local Council/Shire Sunshine Coast Regional Council
  • State QLD

Project description

The proposed section has the following defects: extensive crocodile cracking across the entire surface, potholes, major failures mainly in the outer wheel paths. There are major failures in both the surface and pavement structure of the road.

Pavement rehabilitation consisting of in situ stabilisation of the existing pavement materials, with a 50mm thick dense graded 14mm nominal aggregate asphalt surface, including installation of subsoil drains.

Total cost of proposed project is $140,950

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.