• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2015 - Dec 2015
  • Estimated project cost $232,313
  • Australian Government contribution $232,313
  • Local Council/Shire Parramatta City Council
  • State NSW

Project description

The road surface has been affected by large pavement failures and cracks. The road have been patched multiple times in the past which makes it rough to drive on.

The proposed work includes repair of pavement failure by replacement with asphalt and resurfacing of the road with asphalt. Length = 300 m; Width = 12 m; Area = 3600 m2

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.