• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2015 - Oct 2015
  • Estimated project cost $48,553
  • Australian Government contribution $48,553
  • Local Council/Shire Parramatta City Council
  • State NSW

Project description

The existing surface is very old and rough. Some potholes and other surface defects have developed. There are a lot of loose aggregate on the surface due to ravelling of old surface.

The proposed work includes resurfacing of the road with asphalt. Length = 215 m; Width = 8.2 m; Area = 1763 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.