• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2015 - Mar 2016
  • Estimated project cost $126,681
  • Australian Government contribution $126,681
  • Local Council/Shire Parramatta City Council
  • State NSW

Project description

The road has old surface that is very rough and affected by numerous cracks and disintegration of asphalt especially along kerb and gutters. Some sections of kerb and gutters have been displaced by tree roots.

The proposed work includes replacement of damaged sections of kerb and gutters, repair of pavement failures and resurfacing of the road with asphalt. Length = 275 m; Width = 8.2 m; Area = 2255 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.