• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2015 - Jan 2016
  • Estimated project cost $177,701
  • Australian Government contribution $160,133
  • Local Council/Shire Parramatta City Council
  • State NSW

Project description

The road surface is affected by pavement failures and cracks. The surface is old and rough due to multiple patches and disintegration of existing asphalt surface.

The proposed work includes repair of kerb and gutters, repair of pavement failures and resurfacing of the road with asphalt. Length = 315 m; Width = 8.2 m; Area = 2583 m2.

Total cost of proposed project is $177,701

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.