• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Aug 2015 - May 2016
  • Estimated project cost $1,940,390
  • Australian Government contribution $763,341
  • Local Council/Shire District Council of Cleve
  • State SA

Project description

The existing gravel surface is deteriorating rapidly due to increase in heavy vehicle traffic as this is a road train and B-Double route This has resulted in the road being unsafe for the general public at times

The original road will be reconstructed to a 11 metre formation with additional road building material imported in for the base course ready for the 8 metre 2 coat seal of 14mm and 7mm aggregate. The road has been surveyed and designed to specifications to improve sight distance and gradients for all road users Bitumising will reduce the impact of dust to road users and the environment

Total cost of proposed project is $1,940,390

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.