• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2015 - Jun 2016
  • Estimated project cost $600,000
  • Australian Government contribution $552,853
  • Local Council/Shire Shire of Meekatharra
  • State WA

Project description

The road has become corrugated over time and is also water worn. This has resulted in loss of road surface material. In addition, six floodways in this section of road, wash out badly on each rain event.

Propose to reform and resheet 9m wide gravel surface and restore drainage for a total length of approximately 14kms. Floodways will be reconstructed,including construction of cutoff walls where required.

Total cost of proposed project is $600,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.