• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2015 - Sep 2015
  • Estimated project cost $145,950
  • Australian Government contribution $75,900
  • Local Council/Shire City of Subiaco
  • State WA

Project description

Wearing surface failure reflecting in the form of reflection cracking resulting from the ageing of the bitumen and fatigue failure.

Profiling the pavement by 20-25mm and resurfacing it with Dense Graded Asphalt. Total length of Pavement - 310 metres, Width of Pavement - 7.0 metres(average), Area- 2170 m2( average)

Total cost of proposed project is $145,950

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.