• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2015 - Mar 2016
  • Estimated project cost $579,793
  • Australian Government contribution $579,793
  • Local Council/Shire Shire of Cue
  • State WA

Project description

The road is currently various widths, has some tight radius curves and is flat and below the natural ground level in parts. The sheeting materials are worn away and there is a lack of surface drainage.

Re-align the tight radius curves, install surface drainage, reform the road to be above the natural ground level, gravel sheet the road to have a uniform 9 metre running surface with a 4% crowned cross fall. Install guide posts etc

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.