• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2015 - Feb 2016
  • Estimated project cost $118,034
  • Australian Government contribution $118,034
  • Local Council/Shire Shire of Boyup Brook
  • State WA

Project description

Abel Street, Bridge Street, Railway Parade and Connolly Streets all flood during rain events due to the existing piped street drainage being inadequate to carry the stormwater flows to the towns main drainage system

Upgrade stormwater lines that run from Abel Street, Bridge Street and Inglis Street to the Railway Parade Main Drain

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.