• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2019 - Dec 2019
  • Estimated project cost $265,400
  • Australian Government contribution $265,400
  • State NT

Project description

During the wet season water crosses the main road causing major washouts, requiring constant repair to keep the road open.

The proposed work will consist of two elements. They are: a) Install two (2)450mm storm water pipes and head walls under road at the T section and the low point on the highway, and; b) Raise the road level 200mm for 600 metres. This will be 300 meters either side of the T Section.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.