• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2015 - Mar 2016
  • Estimated project cost $62,118
  • Australian Government contribution $62,118
  • State NT

Project description

The road base no longer exists, with significant seal blow outs, is full of pot holes and sand/dust, and poor drainage. The project will improve all weather access in the Numbulwar CBD, improve drainage and control localized flooding.

Earthworks to include reform road, construct drainage and remove the silt from existing drain. Sealing works to include preparation of pavement, prime coat at 1.2 L/m2, first seal coat at 1.6 L/m2, Second seal coat at 1.2 L/m2, and supply and application of aggregate.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.