• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2015 - Dec 2016
  • Estimated project cost $1,126,888
  • Australian Government contribution $1,121,738
  • Local Council/Shire Baw Baw Shire Council
  • State VIC

Project description

Pavement failures, Longitudional drainage and scouring and potholes

Excavate, pulverise and stabilise with 2% cement, shape, relay and compact pavement to a depth to be determined by soil testing .Spray seal to a width of 7.6m where no kerb exists or to kerb where kerb is in place.Construct piped longtidunal drainage and table drains on the southern side including scour protection

Total cost of proposed project is $1,126,888

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.