• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2015 - Oct 2015
  • Estimated project cost $286,963
  • Australian Government contribution $286,963
  • Local Council/Shire Parramatta City Council
  • State NSW

Project description

Road surface is affected by numerous cracks, potholes and other pavement defects. It is very rough to drive on. The surface looks old and oxidised.

The proposed work includes reconstruction of traffic lanes and resurfacing of the road with asphalt. Length = 360 m; Width = 10.6 m; Area = 3816 m2

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.