• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2016 - Sep 2016
  • Estimated project cost $440,000
  • Australian Government contribution $400,000
  • Local Council/Shire Central Goldfields Shire Council
  • State VIC

Project description

Havelock Street is an Urban Collector road where the existing sealed road pavement, which is 210 metres long by 12 metres wide between kerbs, has failed. The road surface is rutted and heaved and has deteriorated.

The existing pavement is to be removed between the existing kerbs and replaced with a new deeper pavement and the road surface asphalted to provide a level safe surface in the urban environment. Some kerb renewal works will be undertaken to provide safer parking.

Total cost of proposed project is $440,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.