• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2016 - Jun 2016
  • Estimated project cost $120,377
  • Australian Government contribution $120,377
  • Local Council/Shire Shire of Donnybrook Balingup
  • State WA

Project description

Insufficient drainage network in order to cater for expanding residential development. This section of Fleet street has open side road drains. Storm water drainage has been constructed along the rest of Fleet street, leaving this section as a missing link in the drainage network.

Construct storm water drainage along both sides of the road with concrete pipes and side entry pits. Connect with the existing drainage network, install kerbing and back fill open drains to improve surface water runoff and safety.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.