• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2016 - May 2016
  • Estimated project cost $279,115
  • Australian Government contribution $279,115
  • Local Council/Shire Richmond Shire Council
  • State QLD

Project description

The two works sites are existing floodways on the bitumen sealed section of the road. The two floodways are located in a very dangerous dip in the road causing vehicles and heavy transport to dangerously brake on a straight alignment.

Council proposes to raise both floodways, add new pavement and bitumen seal to make the road safe. The floodway at chainage 85.27 kilometre to 85.911 kilometre shall have new larger pipes installed.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.