• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2015 - May 2016
  • Estimated project cost $167,169
  • Australian Government contribution $167,169
  • Local Council/Shire Glen Innes Severn Council
  • State NSW

Project description

The existing sealed pavement is in poor condition, with a very rough road surface, and requiring excessive road patching to meet service levels.

Ripping the existing surface; adding a thin gravel overlay; stabilisation of up to a 200mm pavement depth using either mechanical or chemical means; and bitumen sealing to 4.8 metres in width.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.