• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2015 - Feb 2016
  • Estimated project cost $25,736
  • Australian Government contribution $25,736
  • Local Council/Shire Shire of Pingelly
  • State WA

Project description

Road base failure and surface rutting from water intruding from table drain

Stabilize road base and seal with a two coat bitumen seal using 14mm and 10mm stone. Reshape table drain and install geofabric material and rock armour to improve storm water discharge away from road

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.