• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2015 - Apr 2016
  • Estimated project cost $60,000
  • Australian Government contribution $60,000
  • Local Council/Shire Kingston District Council
  • State SA

Project description

Little James Street is no longer adequate for the volume of traffic, as the road is currently narrow the road suffers from edge break. There is no control over stormwater at the moment, the stormwater is scouring the edge of the road and driveways.

Little James Street will be fully reconstructed and widened to 7.5m from the existing 6m and kerbed on both sides to control stormwater run off. And 10.5m wide sealed footpath will be constructed.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.