• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2016 - Jun 2016
  • Estimated project cost $412,000
  • Australian Government contribution $214,707
  • Local Council/Shire Ku-Ring-Gai Council
  • State NSW

Project description

heavy traffic volumes over time have deteriorated the road surface, allowing water to penetrate the road foundation, which has then started to fail resulting in a rough surface and repeating potholes

Excavate the road foundation in localised areas to a depth of 150mm and replace with new asphalt, remove the surface layer to a depth of 50mm and replace with new asphalt.

Total cost of proposed project is $412,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.