• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2016 - Dec 2017
  • Estimated project cost $1,309,864
  • Australian Government contribution $1,309,864
  • Local Council/Shire Temora Shire Council
  • State NSW

Project description

Deformed, failing pavement. Old drainage infrastructure with major pipe joint displacement at most pipe culvert structures.

Pipe Culvert Replacements at CH 0.54km, CH 2.44km, CH 3.44km, CH 4.34km and Culvert extension at CH 4.74km Rip and shape existing pavement to design subgrade level, import 200mm layer of DGS20 pavement material, shape pavement material to finished surface level, trim and 2 coat bitumen seal

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.