• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2016 - May 2016
  • Estimated project cost $96,904
  • Australian Government contribution $30,000
  • Local Council/Shire Corporation of the Town of Walkerville
  • State SA

Project description

Surface is ravelling and stones are not longer interlocking with binder material. binder is crumbly. pothole maintenance costs have increased on this section of road. 8m x 125m Area = 960m2 10.5m x 130m Area = 1365m2

300-500mmm profiling along both side of kerb. 30m2 of isolated patching. Preparation for road surface overlay and application of with new asphalt surface

Total cost of proposed project is $96,904

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.