• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2016 - Apr 2016
  • Estimated project cost $41,187
  • Australian Government contribution $41,187
  • Local Council/Shire Clarence Valley Council
  • State NSW

Project description

The existing table drains are not of adequate capacity at some locations and have scoured in other locations. As a result damage occurs to the road pavement in heavy rainfall and sediment can be transported to local waterways as a result.

The table drains will be reshaped and reinforced with rock at locations along the table drains to reduce scour potential.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.