• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2016 - Mar 2016
  • Estimated project cost $174,214
  • Australian Government contribution $174,214
  • Local Council/Shire Bourke Shire Council
  • State NSW

Project description

There are areas between this chainage that need urgent gravel patching and gravel resheeting. The is a drainage problem at the 11.3 kilometre mark that needs a 450 millimetre culvert installed to equalise the water.

Gravel resheeting and patching of various areas between the Intersection of the Dowling Track to 49.35 kilometres along the Willara road. Gravel to be applied at 200 millimetre depth at 6 metre wide and compacted. Installation of a 450 millimetre culvert at the 11.3 kilometre mark to improve drainage of the road.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.