• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2016 - Aug 2016
  • Estimated project cost $687,000
  • Australian Government contribution $229,000
  • Local Council/Shire Corporation of the City of Port Augusta
  • State SA

Project description

Caroona Road is in extremely poor standard with a rough driving surface including significant shape failures. Increase usage has caused vehicles to damage the existing sealed pavement and vehicles have been running off road due to narrow road width.

Widen the sealed roadway to 8.0m (approx. 1.2m either side) and provide constructed shoulders to up to 2.0 metres. Included in this work will be an Asphalt overlay of the existing roadway, including crack sealing and edge treatment under the new asphalt layer.

Total cost of proposed project is $687,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.