• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jun 2017 - Jun 2017
  • Estimated project cost $150,000
  • Australian Government contribution $150,000
  • Local Council/Shire District Council of Mount Remarkable
  • State SA

Project description

Due to the steep grades of the Island the Island is susceptible to stormwater damage. The upgrade to the drainage is to alleviate the flow and direct the water down the road to eliminate road surface damage as much as possible.

Install upright kerbing along southern side. At Penang Road install a side entry pit and two other locations towards Range View Drive with 235 metres of pipework and seal.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.