• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2015 - May 2016
  • Estimated project cost $609,500
  • Australian Government contribution $609,500
  • Local Council/Shire Goulburn Mulwaree Council
  • State NSW

Project description

The existing road is narrow (approximately 6m) , has poor pavement structure with substantial edge break, a dangerous horizontal curve and inadequate surface drainage. Garroorigang Road links the Hume Highway to Braidwood Road and has substantial heavy traffic.

The works will widen the existing pavement to a 9m formation including 2 x 3.5m traffic lanes plus a 1m shoulder on each side. There will be improvements to the horizontal and vertical alignment, pavement rehabilitation and additional surface drainage.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.